Howdy,I am new to using the light rail4.0 and have 6x600s on a "tree" and wonder about what speed and delay would gain best results...it is currently on the slowest speed with 20 second delay at either end...
Howdy,I am new to using the light rail4.0 and have 6x600s on a "tree" and wonder about what speed and delay would gain best results...it is currently on the slowest speed with 20 second delay at either end...
Thanks for the reply king, I was thinking the same thing...I backed the bulbs off a bit and everything stacked up a bit more over the course of a few days..
Was at 8"-10" now it's 12-15" away,maybe with increased speed and less delay they can move a bit closer and love it
Just to cover more space i guess.If i had a few less racks say 6 that would be fine i think,Since i am using 8 i tried this rail out,so far not bad...I am now questioning wether skinny foot ball shaped formation of racks and shorter rail distance say 5 ft,or 2 parralel rows and longer light rail run say 6 ft would work more effeciently...What do you think?