slinkysaurus
Well-Known Member
£30K At stake here for the required SMD /G.O.D lights. There's a massive price difference between the two top platform arrays of 16.
I'm confused between them. Which is the better option or pros and cons between C.O.B and G.O.D?
I'm confused between them. Which is the better option or pros and cons between C.O.B and G.O.D?
Last edited: