DirtyMcCurdy
Well-Known Member
I haven't used rockwool but a few times, those little starter plugs, didn't have much success with 'em and wasn't impressed. Rockwool takes to long to dry out, imo. Some have luck with it but I would use either coco, perlite or clay pebbles. Clay pebbles will require frequent cycle times, much more frequent then the other two.Hope you're right about it being just as good, i have to choose to finish out a mother box im working on in dwc or flood and drain, any1 have eny experience using rockwool slabs for flood and drain ?