gohydro
Well-Known Member
OK...I think we have it all cleared up. I spoke to him.
The Main panel os OK. The sub panel needs the 2 15a SP's replaced with a double pole. The breaker with the blue handle isn't being used and the other two breakers (top left of the sub) are 2 diffefent circuits.....1 for the furnace and 1 for who knows what.
You guys can help him out with identifying supplies....romex, connectors, boxes, covers, receptacles, blah,blah, blah.
Good Luck!
GoHydro!
https://www.rollitup.org/do-yourself/164408-6-pvc-system.html
The Main panel os OK. The sub panel needs the 2 15a SP's replaced with a double pole. The breaker with the blue handle isn't being used and the other two breakers (top left of the sub) are 2 diffefent circuits.....1 for the furnace and 1 for who knows what.
You guys can help him out with identifying supplies....romex, connectors, boxes, covers, receptacles, blah,blah, blah.
Good Luck!
GoHydro!
https://www.rollitup.org/do-yourself/164408-6-pvc-system.html