nomofatum
Well-Known Member
This actually makes me think, Fuck decision tree, maybe a calculator with a supplemental mini decision tree would be better, the tree only for weird size/shape spaces.You are still confused about up front dollars. Lets put it this way.
Upfront:
Epistars: $13 per sqft for ideal lighting 2400w (total $415)
CMH: $78 per sqft for ideal lighting 1500w (total $2500)
Operating costs based on 12/12 and 11c per KWA. (adjust as needed to your local)
CMH: $1.98 per day.
Epistars: $3.17 per day. That is $1.19 more per day.
Making break even be at 1752 days. If you run for 1753 days the CMH will be the better deal.
Pick the lowest cost item for your needs/abilities. That would be perfect, what do you guys think?