Hippieryan
Well-Known Member
Well this is kind of phase 1 that has been actually done for some time already, many thanks to someone I saw in RDWC post about just using one of these under tap units to clean up chlorine and get a nice ph level, I have these three girls daisy chained together to give me about 300 litres of water with a stopper float at the top, excuse the drywall dust on top during construction. Plus I have a pump and switch hooked up on the far left for bucket fills for now.still doing some new drywall on top for any chance of Mold