Well this is kind of phase 1 that has been actually done for some time already, many thanks to someone I saw in RDWC post about just using one of these under tap units to clean up chlorine and get a nice ph level, I have these three girls daisy chained together to give me about 300 litres of water with a stopper float at the top, excuse the drywall dust on top during construction. Plus I have a pump and switch hooked up on the far left for bucket fills for now.still doing some new drywall on top for any chance of Mold 04A64643-E792-429F-9698-459ADEAC0E39.jpeg0D9BA562-C27E-46E5-80E5-8CE9E7731EE1.jpeg956AE03F-AF1D-4BA9-902D-F450C928FC27.jpeg
 

Hippieryan

Well-Known Member
So this is kind of phase 2 I guess,, I have this room just shy of 9x9 and this will be my main area with my plants,, I have finalized the 3 walls in concrete board and have the one wall left and ceiling, I will be starting with just 4 plants running RDWC and my main res will be in my work area room where the water system is. The filter in the back is from my existing room and will be swapped over to that room when I am done BDA58911-AAB8-46FB-A819-356DCD54BDA1.jpegF140E9D9-C78B-4FF6-8681-09A9E48511AD.jpegB4A4A9EA-4952-4715-B304-05B33AE47A12.jpeg
 

Hippieryan

Well-Known Member
So I am wired for multiple fans from every corner, humidity up and down sensors that will run to humidity and dehumanizing units, heater/ac, winch to raise and lower my scrog, anyone have any last thoughts on a good idea to wire while I have this ceiling open? Or do I have it covered? Any help would be great
 
Top