AvidSmoker420
Active Member
So I'm a little confused on the rez aspect. So in my setup ill be using Rubbermaid tubs with a pump in each. So my question is do I add the feed lines from the pumps into the rez and set everything in a on 5 min and 1min off. Wouldn't my tub overflow if I have water originally in my tub then turn everything on with timers connect to rez?
Also should I add airstones to rez?
How to connect feed lines properly to rez?
Also should I add airstones to rez?
How to connect feed lines properly to rez?