communistcannabis
Well-Known Member
keep it commin bro, your set up looks superb
The jb quik weld appears to have done the job. I will be installing the cool tube tower today.I might have to install an A/C in the room if the temps are to hard to control. I want to have this thing filled up in a week. Most of the clones are now 6-8" tall, just have to play the waiting game then.
Go to the Depot and pick up a "sharkbite", they are available in 1/2" through 1" sizes and just slide and lock onto the pipes. Easy Squeezy.
They are seven bux or so.
i want to see how your waterlines and res setup comes, im interested in this
Im running the first heat test. my last will be on at night, so this is a night time run with 3 floor fans and no A/C. if i need an A/C i will run out and get one tommorow. my temps with the lights out run between 75-80 so that all good. winter will be here in a few months so that will be a whole other thing to deal with. good times good times.