a2lute
Well-Known Member
So after seeing Renfo's grow I decided to add some side lighting. I tried some QB's in my veg tent and I like them, but the LED's could stand to be spaced out better. I found some LM301B strips, made a quick plan, and got them on order! I expect more parts to trickle in over the next few days but here's what I've been up to
Cut up 25 or so feet of aluminum strap, tack down some keystock to make a quick jig. And yes, that upper middle key stock did get welded down crooked, had to redo that...
Tacked up pile, then a welded pile! Since the tacks were all on the back the frames were pulled in a bit of a bow, I tapped them flat with a small mallet and welded the backside to hold them down. I didn't weld this fully solid, just some stitch welds at each joint. The side with the tacks will get flattened with a flap sander, then I can get started drilling and tapping mounting holes.
Cut up 25 or so feet of aluminum strap, tack down some keystock to make a quick jig. And yes, that upper middle key stock did get welded down crooked, had to redo that...
Tacked up pile, then a welded pile! Since the tacks were all on the back the frames were pulled in a bit of a bow, I tapped them flat with a small mallet and welded the backside to hold them down. I didn't weld this fully solid, just some stitch welds at each joint. The side with the tacks will get flattened with a flap sander, then I can get started drilling and tapping mounting holes.